![]() |
Waste Asphalt Used to Surface Multi-Use Trail
IRONWOOD, MI - Wednesday, September 23, 2009 - Waste material from the City Street Overlay program is being put to use as a surface material on the "multi-use" ATV/Snowmobile Trail #2 through Downtown Ironwood. Several City streets throughout Ironwood are being resurfaced as a part of the City's street maintenance program.
|